Data center providers have gotten the message on sustainability. Customers, investors, and regulators expect greener facilities, and many providers are delivering. So why is community opposition to new projects getting louder?
Because sustainability measures a building’s footprint, and communities are judging something else: whether the deal is fair. Who pays the costs and who got a say? Residents see strain on power, water, and land, and they watch the economic value head somewhere else. A permit doesn’t fix that, since regulators and communities define “value” very differently.
Here’s my argument:
“
The first data center provider to co-develop its infrastructure strategy with the communities it builds in, and to transparently report the net value those communities receive, will be the provider best positioned to hold a lasting social license to operate in the U.S.
The rest of this piece explains why green credentials alone won’t earn that license, how working with a community differs from satisfying a regulator, and what providers can do about it now.
The license the industry hasn’t earned yet
You’ve probably seen this movie. A proposed data center ends up with a packed public hearing, a stalled vote, or a lawsuit. Westfield, Massachusetts is the latest example. A $4 billion campus of up to 274 megawatts, which would have been the largest data center in New England, lost its footing in October when the city planning board unanimously refused to extend a permit first issued in 2021. The mayor said the developer should have done more to speak with residents about their concerns.
The fight is now about whether the community feels like a partner or just a host for someone else’s gain.
Green is table stakes now
Providers are being asked, more and more, to prove their facilities are environmentally sustainable, and plenty have stepped up. Renewable energy sourcing, strong efficiency metrics like PUE, transparent water reporting, embodied carbon, and heat reuse are now standard asks from customers, investors, and regulators. The industry deserves credit for real progress here, from power purchase agreements to better cooling.
Growth is outrunning that progress. Google says its data center electricity use jumped 27% in 2024 while the emissions from that power fell 12%, as its hourly carbon-free energy use rose from 64% to 66%. Nationally, the Department of Energy’s Berkeley Lab estimates data centers used 4.4% of US electricity in 2023 and could use 6.7% to 12% by 2028.
The catch is that providers measure all of this at the corporate or facility level. A provider can ace every target in its sustainability report and still leave the people next door feeling like nothing changed for the better.
Why the pushback won’t go away
Community concerns come from what people live with. Residents worry about what data center electricity demand does to local rates and reliability, and about water use in regions already under stress. They deal with the noise, the backup generators, the construction traffic, and the new transmission lines.
Underneath it all is a trust gap. Sustainability pledges live in glossy reports, while the community lives next to the facility. The complaint is also about fairness and process.
Maine shows how fast this moves. Wiscasset paused its data center talks in November 2025, Lewiston voted down a $300 million proposal weeks later, and Bangor passed a six-month moratorium in April 2026. That same month the legislature passed what would have been the nation’s first statewide moratorium on facilities of 20 megawatts or more, 79 to 62 in the House and 21 to 13 in the Senate. Gov. Janet Mills vetoed it, the override failed, and she created an advisory council by executive order instead.
It’s not just water and power
The things that turn skeptical neighbors into organized opponents go beyond the usual resource debate. Start with land. Big parcels of farmland, open space, or land that could have supported mixed use become fenced-off, low-employment sites, and the community gives up whatever that land might have become.
Then there’s the money. Construction brings a burst of jobs that vanishes, followed by a permanent workforce that’s small for the footprint. Tax abatements and negotiated incentives can shrink the local fiscal return even further, while revenue and profit flow to shareholders and headquarters somewhere else.
Virginia’s legislative auditors found that a typical 250,000-square-foot data center employs roughly 50 full-time workers, about half of them contractors. Statewide, Virginia’s data centers support about 59,000 temporary construction jobs against about 15,000 ongoing operations jobs.
A Brookings study of 770 data centers found that a county’s first one lifts total private employment by about 4% to 5% on average, though permanent on-site staffing stays small.
All the cost, none of the return
Put yourself in the host community’s shoes and the ledger looks lopsided, which is exactly what shapes the vote. The costs are local and you can see them: construction disruption, pressure on the grid and water supply, a changed landscape, noise. The benefits are distant and abstract: cloud services and corporate earnings residents never see.
How it happens makes it worse. Communities often find out after the site is chosen, behind NDAs, and are then asked to react to a design already set. Projects that overpromise on jobs or benefits make the next provider’s job harder.
Bow, New Hampshire resident Leslie Ring put the doubt plainly at a September protest over a possible data center at a shuttered coal plant: “I’m not sure it will bring the economic benefits people think it will.”
Communities aren’t regulators
Regulatory approval and community co-development are two separate relationships. They overlap on land use, grid and water impacts, tax revenue, and jobs, but each looks at those through a different lens.
| Dimension | Government and regulatory bodies | Host community |
| Who they are | Utility commissions, zoning boards, environmental agencies, elected officials | Residents, neighbors, local businesses, civic and community groups |
| What they evaluate | Compliance with law and permit conditions, plus policy goals such as grid reliability, tax base, and regional economic development | Whether the local costs and benefits feel fair to the people who live with the facility |
| Unit of value | Aggregate and jurisdiction-wide: tax revenue, megawatts, jobs counted at the county or state level | Specific and personal: my bill, my water, my street, my children’s opportunities |
| Source of authority | Legal mandate | Social legitimacy, which can still trigger votes, litigation, and political pressure |
| Timing | Defined approval steps and deadlines | Continuous, before and long after approval |
| What “yes” means | A permit is granted | Ongoing consent to operate |
A fully permitted project can still lose its community. So co-development has to happen directly with residents, on its own track and apart from permitting, and net value reporting has to answer the community’s scorecard.
My argument: co-develop, then show your math
A social license comes from a community’s sense of fairness. I think it rests on two things the industry doesn’t do consistently yet.
First, co-develop the strategy. Bring the community in before the site is final, and shape infrastructure, land use, and community investments together. That’s a direct relationship with residents, separate from the engagement regulators require, and the community should set the terms.
Second, communicate net value transparently: what the community gains minus what it bears, in numbers residents can verify, reported over time.
The first provider to do both gets a durable advantage. With projects facing more local scrutiny, a credible track record means faster approvals and less litigation risk. And once communities and regulators see what real partnership looks like, providers who can’t match it may struggle to build. I think the advantage could end up with one provider.
What this looks like in practice
Co-development means advisory bodies with real influence early on, joint land use planning, and community-defined priorities like workforce training, local grid upgrades, or public amenities, backed by binding community benefit agreements. Those promises go to residents and continue after agencies issue the permits.
Net value reporting means a public scorecard, updated regularly, covering local jobs, local procurement spend, tax revenue after incentives, grid and water impacts, and community investment. It earns trust through third-party verification and a consistent methodology.
Some of this is already happening. Lancaster, Pennsylvania signed a public community benefits agreement for a data center project: $20 million for sustainability and local economic initiatives, 100% clean energy, a water cap of 20,000 gallons a day per campus, noise held to pre-construction levels, and penalties for noncompliance. In Frederick County, Maryland, the developer offered more than $110 million in community investments, a project about 20% smaller, and 80% less potable water use once its reclaimed water system is running. The county executive rejected the agreement on September 14 after residents objected to its eight-year limit on zoning changes.
“But what about…”
Fair pushback is coming, so let’s take it head on. “This is just PR.” Only if the numbers can’t be verified or leave out the costs. “It slows us down and costs more.” Compare that to the cost of denied permits and litigation. “Competitors will free-ride on the trust we build.” Trust attaches to specific communities and track records, which are hard to copy. “Regulators already require community input, so we’re covered.” Public comment periods and permit conditions measure compliance.
There’s also an uncomfortable truth: in some places, the net value might come out negative. Transparency shows which projects need a redesign, or shouldn’t happen at all.
Where this leaves us
The license to operate is shifting from regulators and certifiers to the communities themselves. The provider that treats a host community as a real partner, and backs it up with numbers residents can check, is more likely to keep building while others stall.
If I were advising a provider, I’d say pick one host community, co-develop the plan with them, and publish the net value results on a fixed schedule. Communities and policymakers can speed this along by asking for the data and rewarding the providers that share it.